FP Track

JRace Full PU running track/tartan track uses high-density polymer to build a honeycomb structure. Due to the innovation, the track can pass 

1000 times hammer test at the sameposition and maintain over 35% shock absorption. It shows an outstanding performanoe of vertical deformation and duration.



000.png

Parameters of product

bc65a6a7-ebe7-4299-9c00-792b04067ea6.png


Product specifications

A full set of materials according the proportion into the barrel to facilitate the construction

020f01a6-a489-47c7-9a12-b1d21502ea61.png

Construction Process

20 years experience of senior engineers, whole-heartedly provide installation technology and services worldwide

image.png

1. Experienced engineer for over 20 years

Our engineering department has a group of senior engineers with more than 20 years of experience and a professional 

construction team, which can provide high-quality and professional construction guidance, equipment purchase, 

product construction teaching, and base layer evaluation, etc.


2. Professional real-time construction guidance

If there is a construction problem, we will respond within 24 hours to help you find the key to the problem to 

avoid working time delays, and ensure the smooth progress of the project.


3.Project base layer evaluation

According to customer requirements, we can evaluate the foundation of the project to determine whether construction can be 

carried out on this basis, and if there is a problem, how to further strengthen the foundation and adapt to the construction.


Our advantages

1.  Full-automated production line  2. Strict quality inspection process  3. IAAF certificates for all series tracks  4. ITF-3 certificates for SPU


Multi-layer structure,resistant to heavy load

Upgraded formula, ratio and performance are further optimized

Easy and quick to install

Stable structure, long service life

Project cases